Heat pump vs gas boiler: EES model and cost of heat

A group energy-systems practical in my master's at ICAI: we modeled a 25 kW air-to-water heat pump running on R290 (propane) in EES, ran it away from its design point, and compared it with a gas boiler on the cost of each megawatt-hour of heat and on CO2.

Context
Energy-systems practical, MSc Industrial Engineering, Comillas ICAI
Year
2025 (March – April)
Team
Group of three
Stack
EES (Engineering Equation Solver) · Excel
Fig. 01COP (black, left axis) and electrical input (blue, right axis) against outdoor temperature. COP is 3.5 at the 5 °C design point and rises toward 5 in mild weather; below 0 °C the compressor saturates, backup resistance takes over and COP falls to about 1.8.
3.5
COP at the design point, falling to 1.4 at −10 °C
64 vs 115
€/MWh of heat: heat pump vs gas boiler (climate zone C)
2.9 – 3.9 yr
payback, depending on the climate zone
69 – 75 %
less CO2 than the boiler

01The model

The heat pump serves underfloor heating, warming water from 35 to 45 °C. We built the whole cycle in EES around a reciprocating compressor described by its physics: 70 % isentropic efficiency, a polytropic index of 1.154, 5 % clearance volume and 1,480 rpm nominal speed (2,220 rpm maximum), which sizes it at 455.3 cm³ per revolution. The condenser is checked on its T–Q diagram with a pinch-point loop, and the full EES code for design and off-design operation is in the report's annex.

02Off-design performance

At the design point the COP is 3.5. As the outdoor air gets colder the compressor has to work harder for the same heat, and at −10 °C the COP drops to 1.4. The model also gives the compressor speed and electrical input needed to follow the heat demand.

Fig. 02EES off-design run: electrical input (black, left axis) and compressor speed (blue, right axis) against heat demand. The compressor hits its 2,220 rpm limit near 33 kW, and past that point a resistive backup heater covers the shortfall, so consumption climbs steeply.

03Economics

We ran a full heating year for two Spanish climate zones. Zone C needs 58,186 kWh of heat and zone E 90,595 kWh; the heat pump covers them with 15,058 and 26,578 kWh of electricity, where a boiler would burn 71,763 and 111,734 kWh of gas.

  • Levelized cost of heat: 64.0 / 67.5 €/MWh for the heat pump against 114.6 / 112.5 €/MWh for the boiler (zones C / E).
  • Payback of the extra investment: 3.85 years in zone C and 2.89 years in zone E.
  • CO2 savings: 75.2 % and 68.8 %.
Fig. 03Levelized cost of heat for the heat pump in climate zone C. Bars from left: CAPEX, operating, maintenance and CO2 cost, then the total. CAPEX of 10.3 plus electricity at 53.7 gives an LCOH of 64.0 €/MWh; CO2 is zero because the carbon price is already inside the electricity tariff.
Fig. 04The same breakdown for the gas boiler in zone C. CAPEX is small, but fuel at 85.3, maintenance at 3.6 and CO2 at 23.5 €/MWh bring the LCOH to 114.6 €/MWh, about 79 % more than the heat pump.