← Projects/P-09

Industrial warehouse structure

Structural design of a steel warehouse in Madrid: 44.5 m long, with a single 22.9 m clear span of lattice trusses on 6.5 m columns. It was coursework for the Industrial Construction course at ICAI, done in a group of three, and all three of us worked on every part of it: the overall structure, the trusses, the footings and the drawings. We sized the structure by hand to the Spanish building code (CTE), modeled it in CYPE 3D, and issued it as seven A3 drawing sheets that go down to the welds and footings.

Course
Industrial Construction (Construcciones Industriales), Comillas ICAI
Team
Group of three; we all worked on every part: structure, trusses, footings and drawings
Year
2024–25
Stack
CYPE 3D · AutoCAD · Excel
Code
CTE DB SE-AE (loads) · CTE DB SE-A (steel) · S275
Output
Hand-calculation report · CYPE 3D model and report · 7 A3 drawing sheets
Fig. 01CYPE 3D model of the structure, seen from the front gable with its door opening.
44.5 × 22.9 m
footprint, in one clear span
9
frames of lattice trusses on 6.5 m columns
100 kN
machinery load hung from the central truss, the reason that frame is heavier
24
pad footings, in four sizes

01The building

A single-story steel warehouse in Madrid, 44.5 m long and 22.9 m wide, with no interior columns. Nine frames of lattice trusses sit on 6.5 m columns. The roof slopes at 5 % each way from a ridge 8.7 m above the floor. Each truss has 12 panels of 1.908 m and is 1.62 m deep at the eaves and 2.20 m at the ridge.

The trusses are welded from square hollow sections: a #120×5 top chord, a #120×4 bottom chord, #80×3 posts and #60×4 diagonals (side × wall, in mm). The gables have HE 100 B columns at 5.72 m centers and #90×3 girts, and the front gable has a door opening. Crosses of 25 × 7 mm flat bar brace the end bays of the roof, the outer bays of the gables and a strip along both eaves.

Fig. 02CYPE 3D render of the whole structure from above one corner: lattice trusses and purlins over the roof, girts on the walls, and flat-bar bracing crosses.
Fig. 03Interior frame as modeled in CYPE 3D: a Pratt truss in 12 panels spanning 22.9 m between columns with fixed bases.
Fig. 04Front gable frame: a 22.9 m truss in 12 panels of 1.908 m on 6.5 m columns, with HE 100 B gable columns, #90×3 girts, flat-bar bracing in the outer bays and the door opening.

02Loads and sizing by hand

Before building the model, we worked the loads and a full sizing through by hand: purlins, trusses, columns, bracing, base plates and footings. The loads follow CTE DB SE-AE:

  • Permanent: 0.10 kN/m² for the cladding, plus 0.15 kN/m² each assumed for the purlins and the trusses.
  • Snow: 0.6 kN/m², the value for Madrid.
  • Wind: zone A, qb = 0.42 kN/m². The hand pass applied no wind pressure to the near-flat roof.
  • Machinery: an extra part of the brief hung a 100 kN load from the central truss, at the middle of its bottom chord.

With factors of 1.35 on permanent and 1.5 on variable loads, the roof carries 1.44 kN/m² at the ultimate limit state. The steel is S275, so fyd = 275/1.05 ≈ 262 MPa.

The purlins are treated as continuous beams over the frames, and an end span bends more than an interior one. The end bays are therefore shorter: 4.91 m, against about 5.78 m for the six interior bays. Nine frames rather than eight keep every bay under 6 m. An IPE 80 purlin passed the strength check but not the L/300 deflection limit, so the purlins came out as IPE 100. At 1.91 m spacing an IPE 100 weighs about 0.04 kN/m², well under the 0.15 kN/m² assumed for it, so that first assumption was on the safe side.

The 100 kN load is the reason the central frame is heavier than the other eight. In the hand calculation it raises the design force in the central truss's top chord to about 434 kN, so that truss got bigger chords, diagonals and posts than the rest.

Fig. 05Roof plan: nine frames with shorter end bays, purlins at 1.91 m, and flat-bar bracing in the end bays and along both eaves.

03Hand calculation against CYPE

We then modeled the structure in CYPE 3D, and the sections in the drawings come from that model rather than from the hand calculation. The two are written up as separate reports: the CYPE one in November 2024 and the hand calculation in January 2025.

Every member in the comparison came out heavier in CYPE. The purlins went from IPE 100 to IPE 180 at the same 1.91 m spacing, the frame columns from HE 100 B to HE 120 B, and the footings under the long walls from 60 × 60 cm to 145 × 145 cm in plan. Our report put the difference down to the model using the exact self-weight of every member.

The central frame stays the heaviest in the model too: a #160×6 top chord, #70×5 diagonals, #100×3 posts, HE 140 B columns and 165 × 165 × 50 cm footings.

MemberBy handCYPE 3D
PurlinsIPE 100IPE 180
Frame columnsHE 100 BHE 120 B
Columns, central frameHE 100 BHE 140 B
Bottom chord#60×5#120×4
Bottom chord, central frame#100×6#140×6
Top chord#100×50×6#120×5
Footings (cm)60 × 60 × 40145 × 145 × 45
Fig. 06Sections by hand and in the CYPE 3D model. Hollow sections are side × wall in mm (#100×50×6 is a 100 × 50 mm rectangle). The CYPE footing is the size under the long-wall frames.
Fig. 07First step of the model: the nine frames cloned along the 44.5 m length at the bay spacings worked out by hand.
Fig. 08Next step: the roof purlins tie the nine frames together.

04Joints, foundations and drawings

The truss nodes are welded. The weld sheet details three joint types where a #80×3 post and a #60×4 diagonal meet the #120×4 bottom chord. The post gets 3 mm fillet welds and the diagonal 4 mm, with the diagonal at 46.4°, 45.0° or 40.3°.

The columns stand on bolted base plates over 24 reinforced-concrete pad footings, tied together by 40 × 40 cm beams. The frame columns get stiffened plates, and the corner and gable columns smaller ones. Each footing has Ø12 mm bars top and bottom, and its size depends on position:

  • 145 × 145 × 45 cm under the long-wall frames
  • 155 × 155 × 45 cm under the gable columns
  • 165 × 165 × 50 cm under the central frame, which carries the 100 kN load
  • 195 × 195 × 45 cm at the corners

We laid out the drawings in AutoCAD from the CYPE output and plotted them on 25 November 2024 as seven A3 sheets: a 3-D view, the roof plan, the front gable frame, the two roof slopes, the weld details, standard base-plate and footing details, and the foundation plan.

Fig. 09Low perspective along a long wall: red columns on their footings, with the green trusses, purlins and girts and a bracing cross in the end bay.
Fig. 10Weld details for joint types 8, 9 and 11: #80×3 post and #60×4 diagonal on the #120×4 bottom chord.
Fig. 11Foundation plan: 24 pad footings around the perimeter, joined by 40 × 40 cm tie beams.