Hospital building services: HVAC, piping, fire protection and power
Building services for a new care floor of a hospital, centered on its operating room. It was coursework for the Instalaciones course at ICAI, done in a group of three. The mechanical part covered the air conditioning, the chilled-water piping for the MRI scanner, the fire-hose network and the noise of the rooftop plant. I did nearly all of it, including the acoustic study. On the electrical part I worked on the socket outlets, the transformers and the single-line diagram; the rest of the electrical design was group work.
- 5,205 m³/h
- of outdoor air supplied to the operating room at 18 °C, with no recirculation
- +10 / +6 Pa
- pressure steps: operating room over anteroom, anteroom over the waiting area
- 38.45 dB
- at the worst point outside with a 3 m roof screen, down from 50.71 dB (night limit 40 dB)
- ≈ 740 kVA
- forecast load at power factor 0.9, met by two 800 kVA transformers
01The brief
The course took the hospital in Aranjuez (Madrid) as the base for a new care floor and gave each group a different site. Ours was Santander, with summer design conditions of 25.6 °C dry bulb and 22.1 °C wet bulb, so the outdoor conditions and the roof transmission loads had to be recalculated for that climate. For the general care areas, 548 m² with 20 occupants, the cooling load came to about 13.0 kW sensible and 1.4 kW latent, including a 15 % margin.
The work was handed in as two reports, one mechanical and one electrical. The mechanical one covered the air conditioning of the care areas and the operating room, a chiller and its piping for the MRI scanner, the fire-hose network and the noise of the rooftop plant. The electrical one covered the power supply of the same floor.
02Air conditioning
The operating room and its anteroom follow UNE 171340 instead of the general RITE conditions, with the rooms held at 22 °C and 60 % relative humidity. A dedicated all-air unit serves them, with its cooling coil fed with chilled water from a chiller. The operating room is risk class 3, which calls for 15 air changes an hour. It is supplied with 5,205 m³/h at 18 °C, just above the 5,161.5 m³/h that those air changes require, and all of it is outdoor air, with no recirculation.
The rooms are pressurized in a cascade: the operating room 10 Pa above the anteroom, and the anteroom 6 Pa above the bed-waiting area. Each room extracts less air than it is supplied, and motorized variable-air-volume boxes on its supply and extract ducts hold both flows. The difference leaks out through the door gaps, about 446 m³/h from the operating room and 345 m³/h from the anteroom, so air flows out of the clean rooms and not into them. On its way in, the air passes three filter stages: one H13 and two H14.
The room loads are small: 7,024 W sensible and 345 W latent for the operating room and anteroom, with five people and 4 kW of equipment. Most of the work goes into treating so much outdoor air. I traced the process on a psychrometric chart. The outdoor point E is also the mixed point M, since nothing is recirculated. The cooling coil cools and dries the air down to point 1′, at a dew point of 13.5 °C. A reheat coil then warms it at almost constant moisture content to the supply state I (impulsión) at 18 °C, and in the room it warms to the zone state (zona).
The air-handling unit has a rotary heat-recovery wheel, cooling and heating coils, a humidifier and the supply fan, with a separate extract fan that exhausts to the outside. Its cooling load came to about 74 kW for the two rooms, and an 88.2 kW chiller covers it. The energy-saving measures were the heat recovery, EC plug fans, variable-speed drives and scheduling from the building management system. I laid the supply ducts out in AutoCAD over the floor plan, galvanized steel sized for about 6 m/s, with TROX supply diffusers and low-level extract grilles.
03MRI cooling and fire protection
The MRI scanner needs its own chiller for the cryogenic compressor that keeps its helium liquid. The brief put that load anywhere between 6 and 60 kW, and I designed for the top of the range: 60 kW for the compressor plus 7 kW of heat from the 10 kW control cabinet, 67 kW in all. A 71.1 kW chiller on the roof covers it. With the brief's 8 °C temperature difference the loop needs 2 kg/s of water (7.2 m³/h), which a DN50 pipe carries at about 1.26 m/s and 418 Pa/m over the 18 m run down to the scanner's heat exchanger. Of the pump arrangements the brief allowed (one pump, one plus a standby, or two plus a standby), I chose two plus a standby. Each working pump moves 3.6 m³/h against 15 m of head and draws about 580 W.
The fire protection is a network of equipped fire-hose cabinets (BIE). Two main pumps feed it, one on duty and one in reserve, and the design case is the two most remote cabinets running at once at 5 bar. On top of that 5 bar the pump has to lift the water 10 m to the ground floor and overcome 22.7 kPa of friction along the worst path. That puts its duty point at 6.21 bar and 16.52 m³/h, with a 214 mm impeller. One hour of operation, which the regulations require, needs a 16.5 m³ water tank.
04Rooftop noise
The brief also asked for a noise check of the plant on the roof: three air-handling units and a chiller, all running, on top of 35 dB of background noise. The check point is the worst spot 5 m outside the building, and the hospital sits in a type I area, with limits of 50 dB by day and 40 dB at night. The acoustic study was mine. I placed the units on the roof with the noise in mind and measured the distance from each one to the worst point, between 17.7 and 20.3 m.
With the units placed, the four of them still added up to 50.71 dB at that point, over both limits. I added a 3 m screen along the edge of the roof and worked out its attenuation in a spreadsheet from the extra path the sound travels over the top, band by band, from about 11 dB at 63 Hz to about 32 dB at 8 kHz. With the screen, the worst point drops to 38.45 dB, under the night limit.
| Source | No screen | 3 m screen |
|---|---|---|
| Air-handling unit 1 | 45.20 | 30.36 |
| Air-handling unit 2 | 45.45 | 30.80 |
| Air-handling unit 3 | 46.37 | 31.14 |
| Chiller | 34.94 | 23.81 |
| Background | 35.00 | 35.00 |
| Total at the worst point | 50.71 | 38.45 |
05Power
The electrical assignment covered the same ground floor, and on it I worked on the socket outlets, the transformers and the single-line diagram. The load forecast went room by room under the REBT, Spain's low-voltage regulations. The operating room's 24 socket outlets and two surgical lights fall under ITC-BT-38, the REBT instruction for operating rooms. With both construction phases included, the floor came to 663.6 kW, about 740 kVA at a power factor of 0.9. Each transformer was sized at 800 kVA from the Ormazábal catalog, and the substation has two of them, as the regulations require. Its drawing shows the incoming switchgear, a metering unit and the two transformers.
The final single-line diagram was drawn in AutoCAD. The one shown here is an earlier, simpler hand-drawn version, where one transformer stands for the pair. It runs from the substation through the transformer to the main bus and its sub-boards. A second bus can be switched between the mains and a generator. It feeds the MRI board (scanner, chiller and control), a UPS branch and the operating-room board, so those loads keep power if the mains fails.
The rest of the electrical design was group work: cable sizing, protection against a short-circuit current of about 19 kA at the main board, an 867 kVA standby generator, UPS units for the computers and the operating room, earthing (a TT system for the building and an isolated IT system in the operating room), lightning protection and lighting.